Central Basin Oil - Oil and Gas Production

 

 

Recent News

6/29/2008
5th King well spudded


6/28/2008
2 Shallow Horizontal oil wells drilled in June


6/2/2008
Keesee shallow oil project


6/2/2008
Atkinson Lease development


6/2/2008
The 4th King well drilled


5/19/2008
Great shows in the 3rd King Prospect Well


5/19/2008
Atkinson wells 1 & 2 nearly complete


5/4/2008
Third King Prospect Well drilling through 1900'


5/2/2008
Rig was mobilized back to King Prospect this week


4/22/2008
Copperas Cove Williams well status


2/24/2008
Frac performed on Kindler showing some results


2/17/2008
Williams well completed, tested possibly 2 MMCFD


2/7/2008
Rig 5 drilling began today on Thomas #2CB


1/26/2008
Results from NuTech lab analysis are now available


1/17/2008
All 3 Keesee Extension wells drilled now


1/3/2008
Kindler well Core samples being analyzed


12/27/2007
Kindler TD'd, Core Samples Being Analyzed


12/22/2007
Setting plans for 2008


12/3/2007
Brief Overview of some of the Fields Status


11/26/2007
South Texas activities continue


11/17/2007
King Prospect 1st well operations going well


11/14/2007
KING PROSPECT BEGAN DRILLING THIS WEEK


11/9/2007
King Prospect, Rig #5 mobilized


11/4/2007
MORSE LEASE-WELL #1 COMPLETE - touchdown at 4200 feet


10/31/2007
Wireline logging performed on Morse Lease prospect well


10/30/2007
Current Depth - 3511 - Several Gas Kicks


10/29/2007
NOW over 190 FT of Potential Barnett Shale!


10/29/2007
Morse Lease - Well #1 - Rig 5 progress


10/27/2007
Rig #5 deployed to continue the deeper drilling


10/16/2007
Morse Lease - Drilled down to 2710


10/15/2007
MORSE LEASE WELL REACHES 2560 FEET


9/14/2007
Recognized in the September issue of Oil & Gas Investor


8/31/2007
Wilson - Drilling well #8 Down to 1,075’


8/7/2007
Completed 2nd well drilling on West Lewis-Byrd Field


7/22/2007
Brought Nimrod Well #9 online


7/19/2007
10th well almost online-Nimrod. Wilson oil cuts climbing.


7/12/2007
Nitrogen - Acid Frac proving to expand zone potential


7/1/2007
Another Drilling Rig is added to the fleet


6/29/2007
Reading the minds of the previous producers


6/25/2007
450 barrels of fluid with an 8.1% oil cut or 37 barrels


6/5/2007
Walkers Cay Prospect - Offshore Bahamas


2/13/2007
Production Infrastructure is being fine tuned, great results...


8/24/2006
CBO to begin work on Marble Falls well


8/7/2006
Brown County, TX.


8/1/2006
CBO's latest developments...


10/16/2007
Lewis Well Reaches 3190 feet


 

Receive Email Updates:





Contact Central Basin Oil

If you need to contact us about any of our products or services, or about this website, please submit the form below. We will get back with you as soon as possible.

Name:

Email:

Address:

City:

State:

ZIP/Postal Code:

Country:

Phone:

Comments:

 

Copyright © 2008 - Central Basin Oil   All Rights Reserved.