Central Basin Oil - Oil and Gas Production

 

 

Recent News

5/4/2008
Third King Prospect Well drilling through 1900'


5/2/2008
Rig was mobilized back to King Prospect this week


4/22/2008
Copperas Cove Williams well status


2/24/2008
Frac performed on Kindler showing promising results


2/17/2008
Williams well completed, tested possibly 2 MMCFD


2/7/2008
Rig 5 drilling began today on Thomas #2CB


1/26/2008
Results from NuTech lab analysis are now available


1/17/2008
All 3 Keesee Extension wells drilled now


1/3/2008
Kindler well Core samples being analyzed


12/27/2007
Kindler TD'd, Core Samples Being Analyzed


12/22/2007
Setting plans for 2008


12/3/2007
Brief Overview of some of the Fields Status


11/26/2007
South Texas activities continue


11/17/2007
King Prospect 1st well operations going well


11/14/2007
KING PROSPECT BEGAN DRILLING THIS WEEK


11/9/2007
King Prospect, Rig #5 mobilized


11/4/2007
MORSE LEASE-WELL #1 COMPLETE - touchdown at 4200 feet


10/31/2007
Wireline logging performed on Morse Lease prospect well


10/30/2007
Current Depth - 3511 - Several Gas Kicks


10/29/2007
NOW over 190 FT of Potential Barnett Shale!


10/29/2007
Morse Lease - Well #1 - Rig 5 progress


10/27/2007
Rig #5 deployed to continue the deeper drilling


10/16/2007
Morse Lease - Drilled down to 2710


10/15/2007
MORSE LEASE WELL REACHES 2560 FEET


9/14/2007
Recognized in the September issue of Oil & Gas Investor


8/31/2007
Wilson - Drilling well #8 Down to 1,075’


8/7/2007
Completed 2nd well drilling on West Lewis-Byrd Field


7/22/2007
Brought Nimrod Well #9 online


7/19/2007
10th well almost online-Nimrod. Wilson oil cuts climbing.


7/12/2007
Nitrogen - Acid Frac proving to expand zone potential


7/1/2007
Another Drilling Rig is added to the fleet


6/29/2007
Reading the minds of the previous producers


6/25/2007
450 barrels of fluid with an 8.1% oil cut or 37 barrels


6/5/2007
Walkers Cay Prospect - Offshore Bahamas


2/13/2007
Production Infrastructure is being fine tuned, great results...


8/24/2006
CBO to begin work on Marble Falls well


8/7/2006
Brown County, TX.


8/1/2006
CBO's latest developments...


10/16/2007
Lewis Well Reaches 3190 feet


 

Receive Email Updates:




Central Basin Oil News

5/4/2008 - Third King Prospect Well drilling through 1900'
5/2/2008 - Rig was mobilized back to King Prospect this week
4/22/2008 - Copperas Cove Williams well status
2/24/2008 - Frac performed on Kindler showing promising results
2/17/2008 - Williams well completed, tested possibly 2 MMCFD
2/7/2008 - Rig 5 drilling began today on Thomas #2CB
1/26/2008 - Results from NuTech lab analysis are now available
1/17/2008 - All 3 Keesee Extension wells drilled now
1/3/2008 - Kindler well Core samples being analyzed
12/27/2007 - Kindler TD'd, Core Samples Being Analyzed
12/22/2007 - Setting plans for 2008
12/3/2007 - Brief Overview of some of the Fields Status
11/26/2007 - South Texas activities continue
11/17/2007 - King Prospect 1st well operations going well
11/14/2007 - KING PROSPECT BEGAN DRILLING THIS WEEK
11/9/2007 - King Prospect, Rig #5 mobilized
11/4/2007 - MORSE LEASE-WELL #1 COMPLETE - touchdown at 4200 feet
10/31/2007 - Wireline logging performed on Morse Lease prospect well
10/30/2007 - Current Depth - 3511 - Several Gas Kicks
10/29/2007 - Morse Lease - Well #1 - Rig 5 progress
10/29/2007 - NOW over 190 FT of Potential Barnett Shale!
10/27/2007 - Rig #5 deployed to continue the deeper drilling
10/16/2007 - Lewis Well Reaches 3190 feet
10/16/2007 - Morse Lease - Drilled down to 2710
10/15/2007 - MORSE LEASE WELL REACHES 2560 FEET
9/14/2007 - Recognized in the September issue of Oil & Gas Investor
8/31/2007 - Wilson - Drilling well #8 Down to 1,075’
8/7/2007 - Completed 2nd well drilling on West Lewis-Byrd Field
7/22/2007 - Brought Nimrod Well #9 online
7/19/2007 - 10th well almost online-Nimrod. Wilson oil cuts climbing.
7/12/2007 - Nitrogen - Acid Frac proving to expand zone potential
7/1/2007 - Another Drilling Rig is added to the fleet
6/29/2007 - Reading the minds of the previous producers
6/25/2007 - 450 barrels of fluid with an 8.1% oil cut or 37 barrels
6/5/2007 - Walkers Cay Prospect - Offshore Bahamas
2/13/2007 - Production Infrastructure is being fine tuned, great results...
8/24/2006 - CBO to begin work on Marble Falls well
8/7/2006 - Brown County, TX.
8/1/2006 - CBO's latest developments...

 

Copyright © 2008 - Central Basin Oil   All Rights Reserved.